The President

Commissioned by Heembouw, RED completed the entire rough construction of the President's 157 apartments. This was done using a unique tunnel formwork system with a maximum width of no less than 11m, developed in co-makership with Hendriks stalen bekistingtechniek B.V. This allowed us to achieve an unprecedented large bay width of 10,2m while working fast, flexible and safe thanks to tunnel formwork technology. Approximately 170 m² of floor slab was poured daily. It took us two days to complete a floor with six apartments, including self-supporting balcony slabs.

Commissioning party:
Heembouw
Active in:
Location:
The Hague
Specialisms:
Project management
Download leaflet
Height
50
m
Levels
16
Surface area
17696
m2

What we do in concrete terms

concrete
safety
global
international
high-rise
optimisation
reliability
unburdening
courage
frame construction
design
development
collaboration
quality
partnership
project management
innovation
rough construction
engineering
service
quality
realisation
the Netherlands
advice
RED
future
construction methods
speed
integrity
concrete
safety
global
international
high-rise
optimisation
reliability
unburdening
courage
frame construction
design
development
collaboration
quality
partnership
project management
innovation
rough construction
engineering
service
quality
realisation
the Netherlands
advice
RED
future
construction methods
speed
integrity
optimisation
safety
advice
quality
project management
integrity
global
collaboration
future
design
reliability
the Netherlands
concrete
courage
partnership
realisation
unburdening
speed
RED
high-rise
quality
service
engineering
frame construction
development
international
rough construction
construction methods
innovation
optimisation
safety
advice
quality
project management
integrity
global
collaboration
future
design
reliability
the Netherlands
concrete
courage
partnership
realisation
unburdening
speed
RED
high-rise
quality
service
engineering
frame construction
development
international
rough construction
construction methods
innovation
realisation
project management
partnership
construction methods
service
development
courage
integrity
safety
advice
unburdening
collaboration
the Netherlands
innovation
high-rise
future
frame construction
design
speed
RED
quality
reliability
rough construction
engineering
global
concrete
quality
optimisation
international
realisation
project management
partnership
construction methods
service
development
courage
integrity
safety
advice
unburdening
collaboration
the Netherlands
innovation
high-rise
future
frame construction
design
speed
RED
quality
reliability
rough construction
engineering
global
concrete
quality
optimisation
international

Vision and mission

RED DNA

Equality, transparency and trust are the core values that underpin our mission and vision. These core values are embedded in our way of thinking and working.

Read more

The Safety Culture Ladder Step 3

Safety is our top priority. We work safely or we don't work at all!

Read more
career

The future lives here!

Take charge of your career at RED Bouw.

Vacancies